Since inception, we have been extending Lines of Credit (LOC) to enable Indian exporters to enter new geographies or expand their business in overseas export markets without any payment risk from importers. We put special emphasis on extending LOC as an effective market entry tool as well as a means of market diversification for Indian exporters.

We extend LOCs to overseas financial institutions, regional development banks, sovereign governments and other entities overseas, to enable buyers in those countries to import developmental and infrastructure projects, equipments, goods and services from India, on deferred credit terms. We extend LOCs on our own and also at the behest and with the support of the Government of India.


We finance and facilitate LOCs for: 

  • Fostering development partnership.
  • Boosting exports and employment generation,
  • Creating positive multiplier effect of growth and
  • Expanding horizons of partnership
 

Objective of Government of India supported LOCs

In 2003-04, the Government of India (GOI) formulated the Indian Development Initiative, now known as Indian Development and Economic Assistance Scheme (IDEAS), with the objective of sharing India's development experience to:

  • Fund economic and infrastructure projects in the partner countries,
  • Generate socio-economic benefits in the partner countries,
  • Promote bilateral trade in goods and services; and
  • Support capacity building and skills transfer.

by extending concessional Government of India supported LOCs routed through Exim Bank, to developing partner countries.

The Ministry of External Affairs (MEA), Development Partnership Administration (DPA) Division deals with India's development assistance programmes abroad, including LOCs routed through Exim Bank. These LOCs are extended to partner countries for execution of projects including large-scale and complex projects by Indian companies.

Both bilateral and multilateral assistance typically follow a sequence of standard procedures:

  • Project identification and preparation,
  • Review and approval of the project proposal,
  • Offer of the loan, acceptance and execution of loan agreement,
  • Project implementation, monitoring and supervision, and
  • Socio-economic impact assessment after project completion

Lessons learned from the impact assessment/evaluation act as feedback to the preparation, review and implementation of future projects.

  • These loans finance project exports and the import of goods and services from India.
  • Goods and services (including consultancy services) for minimum 75% value of the contracts covered under these loans must be sourced from India. A relaxation of 10% may be considered on a case-to-case basis.
  • LOCs may finance upto 100% value of contract on FOB/CFR/CIF/CIP basis.
  • Soft loans under the scheme shall be free from all kinds of taxes and duties of any nature whatsoever levied in the recipient country (including all corporate/personal/value added taxes, import/customs duties, special levies and social security contributions for temporary employees deputed by Indian exporters) in relation to the project execution in the country.

resource1

GOI Statistics LOCs_28.02.2026

resource1

Pipeline LOCs_28.02.2026

resource1

Operative LOCs_28.02.2026

resource1

Model Bidding Document for Procurement of Goods

resource1

Model Bidding Document for Selection of Consultant

resource1

Model Prequalification Document for EPC Contract

resource1

Model Prequalification Document for DPR / PMC Consultant

resource1

Model Prequalification Document for Supply Contracts

resource1

Model Bidding Document for EPC Contracts

resource1

List of Contracts Included from October 01, 2022 till January 31, 2025

resource1

Contract awarded to Akar Shakti Engg Industries – March 2025

resource1

Contract awarded to Megha Engineering and Infrastructure Limited – May 2025

resource1

Contract awarded to Bajaj Steel Industries Limited – June 2025

resource1

Contract awarded to Shrifal Packaging Private Limited – July 2025

resource1

Result of Qualification of Engineering Procurement Construction (EPC) Contractor for the Completion of Balance Works for Establishment of Centre of Excellence in Farm Mechanization in Rwanda

resource1

Result of Pre-Qualification of consultant for preparation of DPR for “Agricultural Component of the Agro-Industrial Pole Project in the North (2PAI-Nord), Republic of Cote d’ Ivoire

resource1

Result of Pre-Qualification of consultant for preparation of DPR for “Construction of Drinking Water and Sanitation Infrastructure in Upper Guinea and Forest Guinea in the Republic of Guinea

resource1

Result of Qualification of Engineering, Procurement and Construction (EPC) Contractors for Construction of Mauritius Disciplined Forces Academy Building at Cote D’Or, Mauritius

resource1

Result of Pre-Qualification of Consultant for Preparation of DPR and Providing PMC Services for Water Supply Systems to Towns of Beyla, Koubia and Fria in Guinea

resource1

Result of Pre-Qualification of Engineering Procurement Construction (EPC) Contractor for the “Stung Sva Hab Water Resources Project” in Cambodia

resource1

Result of Prequalification of Consultants for preparation of Detailed Project Report and Tendering Services for Two Solar Projects in Guinea

resource1

Result of Prequalification of EPC Contractors for Installation of Solar Photovoltaic Power Plant at Cheddi Jagan International Airport, Guyana

resource1

Result of Pre-Qualification of Project Management Consultant (PMC) for “Reconstruction of Aldo Chavarria Hospital in Managua, Nicaragua"

resource1

Result of Pre-Qualification of Project Management Consultant (PMC) for “Strengthening of Water Supply Sustainability” project in Zanzibar, Tanzania

resource1

Result of Prequalification of Engineering Procurement Construction EPC (Contractor) for Strengthening the Water Supply of Grand Conakry Project in the Republic of Guinea

resource1

Result of Prequalification of Project Management Consultant (PMC) for Strengthening the Water Supply of Grand Conakry Project in the Republic of Guinea

resource1

Result of Prequalification of EPC Contractors for Construction of the Barclayville –Sasstown- Klowne Road in the Republic of Liberia

resource1

Result of Prequalification of EPC Contractors for the Solar Water Pumping System & Pico Hydropower Project in Three Provinces of Lao PDR

resource1

List of prequalified companies

Visit https://eprocure.eximbankindia.in for accessing the live PQ Documents and for application submission
resource1

Application Document for Qualification of EPC Contractor for Construction of Kono University of Science and Technology in Sierra Leone

resource1

Addendum to the Request for Empanelment [RFE] for Continuous Empanelment of Consultants as Technical & Procurement Experts with Exim Bank

resource1

Qualification Document for Qualification of EPC Contractor for Construction of Water Supply System in 4 Towns, Sierra Leone: Extension in Bid Due Date to February 19, 2026

resource1

Qualification Document for Qualification of EPC Contractor for Construction of Water Supply System in 4 Towns, Sierra Leone: Addendum 1 (Amendment in Clause No. 2.11)

resource1

Application Document for Qualification of EPC Contractor for Construction of Mauritius Disciplined Forces Academy Building at Cote D’Or, in Mauritius: Addendum 3 (Amendment in Clause Nos. 2.11.4 and 2.12.7)

resource1

Minutes of the Pre-Bid Meeting held on January 19, 2026, for Qualification of EPC Contractor for Construction / Rehabilitation of Potable Water Supply Facilities in Four Communities in Sierra Leone

resource1

Notice for Pre-Bid Meeting for Qualification of Engineering Procurement and Construction (EPC) Contractor for Construction / Rehabilitation of Potable Water Supply Facilities in 4 Communities in Sierra Leone

resource1

Application Document for Qualification of EPC Contractor for Construction of Mauritius Disciplined Forces Academy Building at Cote D’Or, in Mauritius: Addendum 2 (Amendment in Clause No. 1.3 – Schedule of RFQ Process)

resource1

Qualification Document for Qualification of EPC Contractor for Construction of Water Supply System in 4 Towns, Sierra Leone: Pre-Bid Meeting Date is January 19, 2026

resource1

REQUEST FOR PROPOSAL FOR ENGAGEMENT OF CONSULTANT FOR PROCUREMENT MANAGEMENT SUPPORT SERVICES UNDER GOVERNMENT OF INDIA’S LINES OF CREDIT (GOI-LOCs) – ADDENDUM I

resource1

REQUEST FOR PROPOSAL FOR ENGAGEMENT OF CONSULTANT FOR PROCUREMENT MANAGEMENT SUPPORT SERVICES UNDER GOVERNMENT OF INDIA’S LINES OF CREDIT (GOI-LOCs) – CLARIFICATIONS ON PRE-BID QUERIES

resource1

Request for Empanelment-Continuous Empanelment of Consultants as Technical & Procurement Experts

resource1

Application Document for Qualification of EPC Contractor for Construction of Mauritius Disciplined Forces Academy Building at Cote D’Or, in Mauritius: Addendum 1 (Amendment in Clause No. 2.12.1 b

resource1

Request for Qualification (RFQ) Document for Qualification of EPC Contractor for completion of Balance Works for Establishment of Centre of Excellence in Farm Mechanization in Rwanda: Extension in Bid Due Date to January 14, 2026

resource1

Application Document for Prequalification of Pre-Qualification of DPR and / or PMC Consultant for Construction of Drinking Water and Sanitation Infrastructure in Upper Guinea and Forest Guinea in the Republic of Guinea: Extension in the Application submission due date and Application opening date.

resource1

REQUEST FOR PROPOSAL FOR ENGAGEMENT OF CONSULTANT FOR PROCUREMENT MANAGEMENT SUPPORT SERVICES UNDER GOVERNMENT OF INDIA’S LINES OF CREDIT (GOI-LOCs)

resource1

Minutes of the Pre-Bid Meeting held on December 19, 2025, for Qualification of EPC Contractor for completion of Balance Works for Establishment of Centre of Excellence in Farm Mechanization in Rwanda

resource1

Minutes of the Pre-PQ Meeting held on December 17, 2025, for Prequalification of Pre-Qualification of DPR and / or PMC Consultant for Construction of Drinking Water and Sanitation Infrastructure in Upper Guinea and Forest Guinea in the Republic of Guinea

resource1

Application Document for Qualification of EPC Contractor for Construction of Mauritius Disciplined Forces Academy Building at Cote D’Or, in Mauritius: Pre-Bid Meeting Date is December 30, 2025

resource1

Request for Qualification (RFQ) Document for Qualification of EPC Contractor for completion of Balance Works for Establishment of Centre of Excellence in Farm Mechanization in Rwanda: Extension in Pre-Bid Meeting Date to December 19, 2025

resource1

Application Document for Prequalification of Pre-Qualification of DPR and / or PMC Consultant for Construction of Drinking Water and Sanitation Infrastructure in Upper Guinea and Forest Guinea in the Republic of Guinea: Extension in Pre-PQ Meeting Date and the Application submission due date and Application opening date.

resource1

Application Document for Prequalification of Pre-Qualification of DPR and / or PMC Consultant for Construction of Drinking Water and Sanitation Infrastructure in Upper Guinea and Forest Guinea in the Republic of Guinea: Extension in Pre-PQ Meeting Date to December 12, 2025

resource1

Application Document for Qualification of EPC Contractor for completion of Balance Works for Establishment of Centre of Excellence in Farm Mechanization in Rwanda: Pre-Bid Meeting Date is December 15, 2025

resource1

Request for Proposal For Engagement of Consultant for Undertaking Socio-Economic Impact Assessment of Projects Funded Under Government of India’s Lines of Credit (Goi-Locs) in Borrower’s Countries.

resource1

Application Document for Prequalification of Pre-Qualification of DPR and / or PMC Consultant for Construction of Drinking Water and Sanitation Infrastructure in Upper Guinea and Forest Guinea in the Republic of Guinea: Pre-PQ Meeting Date is December 09, 2025

resource1

Request for Proposal for Engagement of Consultant for Undertaking Socio-Economic Impact Assessment of Projects Funded Under Government of India’s Lines of Credit CREDIT (GOI-Locs) in Borrower’s Countries.

resource1

Application Document for Prequalification of Project Management Consultant (PMC) for Replacement and Equipment of the High Technology Centre at Antonio Lenin Fonseca Hospital in Managua, Nicaragua:  - Addendum 2 (Amendment in Clause No. 1.3.1)

resource1

Request for Proposal for Engagement of Consultant for Undertaking Socio-Economic Impact Assessment of Projects Funded Under Government of India’s Lines of Credit (GOI-LOCs) in Borrower’s Countries.

resource1

Application Document for Prequalification of Engineering Procurement and Construction (EPC) Contractor for Replacement and Equipment of the High Technology Centre at Antonio Lenin Fonseca Hospital in Managua, Nicaragua:  - Addendum - 2 (Amendment in Clause No. 1.3.1)

resource1

Application Document for Prequalification of Engineering Procurement and Construction (EPC) Contractor for Reconstruction of the Aldo Chavarria Hospital in Managua, Nicaragua: Addendum-3 (Changes in Clause 1.3.1)

resource1

Request For Proposal for Engagement of Consultant for Undertaking Socio-Economic Impact Assessment of Projects Funded Under Government of India’s Lines of Credit (Goi-Locs) In Borrower’s Countries

resource1

Application Document for Prequalification of Project Management Consultant (PMC) for Replacement and Equipment of the High Technology Centre at Antonio Lenin Fonseca Hospital in Managua, Nicaragua:  - Addendum 1 (Amendment in Clause No. 1.3.1)

resource1

Application Document for Prequalification of Engineering Procurement and Construction (EPC) Contractor for Reconstruction of the Aldo Chavarria Hospital in Managua, Nicaragua: Addendum-2 (Changes in Clause 1.3.1)

resource1

Application Document for Prequalification of Engineering Procurement and Construction (EPC) Contractor for Replacement and Equipment of the High Technology Centre at Antonio Lenin Fonseca Hospital in Managua, Nicaragua:  - Addendum 1 (Amendment in Clause No. 1.3.1)

resource1

Application Document for Prequalification of Consultant for preparation of Detailed Project Report (DPR) for Agricultural component of the Agro-Industrial Pole (2PAI-Nord) Project in Cote d'Ivoire: Addendum-2 (Changes in Clause 1.3.1)

resource1

Application Document for Prequalification of Engineering Procurement and Construction (EPC) Contractor for Reconstruction of the Aldo Chavarria Hospital in Managua, Nicaragua: Addendum-1 (Changes in Clause 1.3.1)

resource1

Application Document for Prequalification of Consultant for preparation of Detailed Project Report (DPR) for Agricultural component of the Agro-Industrial Pole (2PAI-Nord) Project in Cote d'Ivoire: Addendum-1 (Changes in Clause 1.3.1)

resource1

Minutes of the Pre-PQ Meeting, held on September 16, 2025, for Pre-Qualification for EPC Contractor vide reference. no. GOILOC-334/Nicaragua/EPC-101 dated September 10, 2025, for “Reconstruction of the Aldo Chavarria Hospital” in Managua, Nicaragua

resource1

Minutes of the Pre-PQ Meeting, held on September 17, 2025, for Pre-Qualification for preparation of DPR vide reference. no. GOILOC-284 (P13)/ EBID (Cote d'Ivoire)/CS-67 dated September 04, 2025, for “Agricultural Component of the Agro-industrial Pole Project in the North (2PAI-NORD)”, in the Republic of Cote D’ivoire

resource1

Application Document for Prequalification of PMC Consultant for the Replacement and Equipment of the High Technology Centre at Antonio Lenin Fonseca Hospital in Managua, Nicaragua: Pre-PQ Meeting date is October 06, 2025

resource1

Application Document for Prequalification of Engineering Procurement and Construction (EPC) Contractor for Replacement and Equipment of the High Technology Centre at Antonio Lenin Fonseca Hospital in Managua, Nicaragua...

resource1

Application Document for Prequalification of EPC contractor for the Replacement and Equipment of the High Technology Centre at Antonio Lenin Fonseca Hospital in Managua, Nicaragua: Pre-PQ Meeting date is September 25, 2025

resource1

Application Document for Prequalification of Engineering Procurement and Construction (EPC) Contractor for Reconstruction of the Aldo Chavarria Hospital in Managua, Nicaragua: Pre-Bid Meeting date is September 16, 2025

resource1

Application Document for Prequalification of Consultants for preparation of Detailed Project Report (DPR) for Agricultural component of the Agro-Industrial Pole (2PAI-Nord) Project in Cote d'Ivoire - Addendum I: Amendment in Clause No. 1.3.1 (Pre- PQ Meeting date)

resource1

Application Document for Prequalification of Consultant for preparation of Detailed Project Report (DPR) for Agricultural component of the Agro-Industrial Pole (2PAI-Nord) Project in Cote d'Ivoire”: Pre-Bid Meeting date is September 11, 2025

resource1

Pre-Qualification of DPR and / or PMC Consultant for Construction of Water Supply Systems in Towns of Beyla, Koubia, and Fria in Guinea: Addendum-2 for extension in Application Submission Due Date.

resource1

Prequalification of EPC Contractor for Stung Sva Hab Water Resources Development Project, Cambodia - Addendum-II for extension in Application Submission Due Date

resource1

Pre-Qualification of DPR and / or PMC Consultant for Construction of Water Supply Systems in Towns of Beyla, Koubia, and Fria in Guinea - Addendum-I [Revised]

resource1

Minutes of the Pre-PQ Meeting, held on June 12, 2025, for Pre-Qualification of DPR and / or PMC Consultant for Construction of Water Supply Systems in Towns of Beyla, Koubia, and Fria in Guinea

resource1

Notice for Pre-PQ Meeting for Prequalification of DPR and / or PMC Consultant for Construction of Water Supply Systems in Beyla, Koubia, and Fria, Guinea

resource1

Minutes of the Pre-PQ Meeting, held on May 30, 2025, for Pre-qualification of Engineering Procurement and Construction (EPC) Contractor for Stung Sva Hab Water Resources Development Project, Cambodia.

resource1

Prequalification of EPC Contractor for Stung Sva Hab Water Resources Development Project, Cambodia - Addendum I

resource1

Prequalification of DPR Consultants and PMC for Water Supply Systems in Towns of Beyla, Koubia, and Fria, in Guinea. Pre-Application Meeting on June 12, 2025

resource1

Notice for Pre-PQ Meeting for Pre-qualification of Engineering Procurement and Construction (EPC) Contractor for Stung Sva Hab Water Resources Development Project, Cambodia.

 

resource1

Prequalification of EPC Contractor for Stung Sva Hab Dam and Water Resources Development Project in Cambodia

resource1

Invitation for industry consultation: engagement of engineering, procurement and construction (epc) contractor for stung sva hab water resources development project, involving construction of dam, in cambodia

resource1

Engagement of Lender’s Independent Engineer (LIE) for Rehabilitation of Road N280/N281 between Tica, Buzi and Nova Sofala, in Mozambique - Addendum-I for extension in Application Submission Due Date

resource1

Minutes of the Pre-EOI Meeting for Engagement of Lender’s Independent Engineer (LIE) for Rehabilitation of Road N280/N281 between Tica, Buzi and Nova Sofala, in Mozambique.

resource1

Prequalification of EPC Contractor for for Stung Sva Hab Water Resources Development Project, Cambodia - Addendum-II for extension in Application Submission Due Date

resource1

Notice for Pre-EOI Meeting for Engagement of Lender’s Independent Engineer (LIE) for Rehabilitation of Road N280/N281 between Tica, Buzi and Nova Sofala, in Mozambique

resource1

Minutes of the Pre-PQ Meeting for Pre-qualification of Engineering Procurement and Construction (EPC) Contractor for Stung Sva Hab Water Resources Development Project, Cambodia.

resource1

Prequalification of EPC Contractor for Stung Sva Hab Water Resources Development Project, Cambodia - Addendum I

resource1

Prequalification of EPC Contractor for Design, Supply, Installation, and Commissioning of a 3 MW (AC) Grid-tied Solar Photovoltaic System at Cheddi Jagan International Airport (CJIA), Timehri, Guyana- Addendum III

resource1

Invites Expression of Interest for engagement of lender’s independent engineer [LIE] for the rehabiliation of road n280/n281 between tica, buzi, and nova sofala, in Mozambique

 

resource1

Do's and Don’ts for Procurement under LOCs

resource1

EXIM Procurement-DOs and Donts of Tendering_French

resource1

IDEAS 2022

resource1

IDEAS_guidelines_FR

resource1

Project Prepaaration Facility_Guidelines 15.1.2018

resource1

Project Preparation Facility - French